All the blocks are up, and most of the window cutouts are done..
Next is the concrete on the roof, finishing cutting out the areas for the windows and finally mounting windows.
Anne and Mads is building a house and are moving from the city center to the sub-urbs.
tirsdag den 30. april 2013
søndag den 21. april 2013
Second floor walls done...
The concrete has now been poured into all the main walls of the Second floor.
The window areas has still not been "cut" free. As the ISOBYG system is like LEGO, but only with one length of blocks (two heights 20 and 30 cm) you still need to "overlay" them and then cut the blocks after the concrete has set for a while.
torsdag den 18. april 2013
2nd Floor Progress...
Second floor is now almost done for concrete and the concrete truck will arrive early tomorrow morning with a pump attached so the walls can get filled.
Final picture shows my friend Mark demonstrating how light weight the Isobyg building blocks are.
Final picture shows my friend Mark demonstrating how light weight the Isobyg building blocks are.
mandag den 15. april 2013
Floors for Orangerie/Scullery
The floors for the Orangerie has now be made and the walls for the second floor can now be made.
These are hopefully done end of this week.
These are hopefully done end of this week.
onsdag den 10. april 2013
Second level floors are now up!
The concrete has now been poured for the second level floors.
It is now possible to see what view we will have from our living room.
On a good day it is possible to see all the way across the Aarhus bay to Mols.
Even a bit of the Rainbow on top of Aros can be seen.
It is now possible to see what view we will have from our living room.
On a good day it is possible to see all the way across the Aarhus bay to Mols.
Even a bit of the Rainbow on top of Aros can be seen.