The concrete has now been poured into all the main walls of the Second floor.
The window areas has still not been "cut" free. As the ISOBYG system is like LEGO, but only with one length of blocks (two heights 20 and 30 cm) you still need to "overlay" them and then cut the blocks after the concrete has set for a while.
Ingen kommentarer:
Send en kommentar